Spider Drilling Method

Reduce the construction period and costs for rebar insertion work! We can accommodate double pipe drilling without the need for scaffolding.

The "Spider Drilling Method" is recommended for carrying out rebar insertion work under special conditions where market prices cannot be applied. Considering the site conditions, the optimal work type is selected from three options: "scaffold type," "no scaffold type," and "crane type." Additionally, depending on the conditions of the ground being worked on, either "single pipe drilling" or "double pipe drilling" methods can be chosen, allowing for adaptation to unstable ground conditions. 【Features】 ■ Choose from scaffold type, no scaffold type, and crane type ■ Optimal for special conditions ■ Can reduce construction space ■ Reduces construction costs and duration with minimal temporary works ■ Shortens the construction period and costs for rebar insertion work *For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Spider Drilling Method, No Scaffolding Type

Recommended for steep slopes and high-altitude work! Scaffold-free spider drilling method.

The "Spider Drilling Method - No Scaffolding Type" is a recommended method for performing rebar insertion work under special conditions where market unit prices cannot be applied. It is particularly effective for long slopes where temporary scaffolding would become large, and for work at extremely high altitudes. It is ideal for sites where temporary scaffolding cannot be installed due to obstacles at the bottom of the slope, such as slope protection on steep terrain. Additionally, it can reduce construction costs and construction days with minimal temporary work. 【Features】 ■ Optimal for long slopes and high-altitude work ■ Ideal when scaffolding cannot be installed due to obstacles at the bottom of the slope ■ Reduces the required construction space ■ Minimizes construction costs and days with minimal temporary work *For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Other civil engineering works

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration